is it possible to run NQEs immediately after a snapshot completes? If Forward can baseline what NQEs are always run after a snapshot completes (possibly this data baseline is based upon a period of time such as 30 days or some admin defined time period). Administrators can use this baseline data to flag those NQEs of priority to run immediately after the snapshot completes. in this way, results from priority NQEs are immediately available (from cached results) for applications to use with minimal delay.
Page 1 / 1
In the upper left there is an NQE section for NQE Verifications. Add the NQE there. And if you’d like to add a violation, check out the first section of the NQE docs. Very effective means to know if something passed or failed.
https://fwd.app/docs/nqe/
Reply
Sign up
Already have an account? Login
Welcome to the Forward Networks Community
Select a login option:
Register / Login Forward Employee LoginEnter your E-mail address. We'll send you an e-mail with instructions to reset your password.